A diversion route will be signposted via Gelvin Road, Legavallon Road, Temple Road, Lisnascreghog Road & vice versa.Closure is required continuously for A6 Dualling - construction of overbridge.Alternative route: A6 Foreglen Road, B74 Feeny Road and vice versa.This is to facilitate the installation of a new natural gas mains by Firmus Energy.Closure required continuously for A6 Dualling - construction of Overbridge (Delayed due to Covid-19)Alternative route: A6 Foreglen Road - B74 Feeny Road and vice versa.The Ballycoshone Road & Lisnamulligan Road will be closed from 6th Apil until 17th August to facilitate NIW pipe laying.Traffic will be diverted via Hilltown Road - Ballykeel Road - Castlewellan Road and vice versaTemporary Speed limit is required for roadworks that are being undertaken on B95 Doagh Road, Ballyclare.Taffic signs will be erected on the road in due course, warning  the use of the road is subject to 30pmh speed limit restriction.Temporary 40mph speed limit. Vehicles requiring access to lands or premises abutting the closed length of road will be accommodated. Subsequent progression into the Construction Programme is dependent on the level of funding available at that time.A list of major road improvement schemes currently under construction.Gateway procedures for the progression of major road projects

Traffic signs warning that the use of the road is subject to the above speed limit restriction and to indicate the nature and extent of the restrictions wil be erected on the road in due course.40mph speed limit because works are being or are proposed to be executed on or near Magheramore Road and Feeny Road. Traffic signs will be erected on the road in due course.Temporary 50mph speed limit on A6 Toome By Pass, between the Drumderg Roundabout and the Brecart Roundabout (westbound only).Commencing on Mon 13 Jan 2020 for a period of 1 year being satisfied that traffic should be restricted because roadworks are being undertaken on A6 Moneynick Road, Randalstown.Temporary 40 mph Speed Limit restricting traffic to facilitate the carriageway works.Traffic signs warning that the use of the road is subject to the above speed limit restriction and to indicate the nature and extent of the restriction will be erected on the road in due course.Temporary 40mph speed limit because works are being or are proposed to be executed on or near Magheramore Road & Feeny Road. Major road improvements - Inception to construction RSPPG E030; Major works estimates RSPPG E058; RSHQ management of contract approval for schemes in excess of £1.5m RSPPG P003; Director of Engineering Memorandums. Keep up to date with current and forthcoming road maintenance using our roadworks report. The highest priority schemes will be considered for progression into the Preparation Pool.This allows high priority schemes to be advanced through the statutory processes up to the point where a decision to commit to invest in building the solution can be made. From A6 Foreglen Road To U1153 Old Foreglen Road (Continuously)From B74 Glenshane Road To A6 Foreglen Road (Continuously)Temporary 40 mph Speed Limit required for execution of works on the carriageway. CASTLEWELLAN ROAD NEWRY ROAD ROSTREVOR ROAD RATHFRILAND ROAD.Closure is required continuously for water main replacement works.Lane closure from A2 Birdge End to A2 Middlepath Street.Closure required daily for upgrade of Street Light and removal of high mast lighting.THE ABOVE ROAD CLOSURE IS TO FACILITATE RESURFACING.Cars and LCVs are being diverted via A28 Carnbane Way, A27 Armagh Road, A27 Canal Street and A27 New Street Downshire Road.HGVs are diverted via A2 Dublin Road and A2 Bridge Street.Closure required daily for installation of new Watermain.Cars and LCVs are being diverted vai A28 Carnbane Way, A27 Amagh Road, A27 Canal Street and A27 New Street Downshire Road.HGVs are being diverted via A2 Dublin Road and A2 Bridge Street.DIVERSION ROUTE IS AS FOLLOWS B113 DUBLIN ROAD - A1 NEWRY BY PASS - B113 FORKHILL ROAD - U5345 LOW ROAD & VICE VERSAClosure required continuously to facilitate the grid connection of Evishagaran Windfarm. Related to Road improvement schemes Most recent publications DfI/2019-0333: EIR Request for a list of locations on the waiting list for traffic calming measures in Ards & North Down Roads Minister Shaun Woodward confirmed a proposed timetable for the scheme, when he announced that Highway Management (NI) has been selected as the provisional preferred bidder for the project.